Remarks |
|||||||
The vessel is currently in navigation. The BWTS has been installed. The actual power of the main engine is 1750KW. SS/DD April 30, 2025.Currently, we are operating in the Southeast Asia route and can switch to RINA classification society. The time required is 45 days.
![]() |
|||||||